NAB 20-09 TBO Trüllikon-1-1: Data Report
Nagra (2021): TBO Trüllikon-1-1: Data Report Summary Plot. Nagra Arbeitsbericht NAB 20-09 SP.
Ammen, M. & Palten, P.-J. (2021): TBO Trüllikon-1-1: Data Report Dossier I Drilling. Nagra Arbeitsbericht NAB 20-09 I.
Kaehr, D. & Gysi, M. (2021): TBO Trüllikon-1-1: Data Report Dossier II Core Photography. Nagra Arbeitsbericht NAB 20-09 II.
Schwarz, M., Jordan, P., Schürch, P., Naef, H., Ibele, T., Felber, R. & Gysi, M. (2021): TBO Trüllikon-1-1: Data Report Dossier III Lithostratigraphy. Nagra Arbeitsbericht NAB 20-09 III.
Wohlwend, S., Bläsi, H.R., Feist-Burkhardt, S., Hostettler, B., Menkveld-Gfeller, U., Dietze, V. & Deplazes, G. (2021): TBO Trüllikon-1-1: Data Report Dossier IV Microfacies, Bio- and Chemostratigraphic Analysis. Nagra Arbeitsbericht NAB 20-09 IV.
Ebert, A., Cioldi, S., Gregorczyk, L., Rust, S., Böhi, D. & Gysi, M. (2021): TBO Trüllikon-1-1: Data Report Dossier V Structural Geology. Nagra Arbeitsbericht NAB 20-09 V.
Gonus, J., Bailey, E., Desroches, J. & Garrard, R. (2021): TBO Trüllikon-1-1: Data Report Dossier VI Wireline Logging and Micro-hydraulic Fracturing. Nagra Arbeitsbericht NAB 20-09 VI.
Schwarz, R., Schlickenrieder, L., Müller, H.R., Köhler, S., Pechstein, A. & Vogt, T. (2021): TBO Trüllikon-1-1: Data Report Dossier VII Hydraulic Packer Testing. Nagra Arbeitsbericht NAB 20-09 VII.
Aschwanden, L., Camesi, L., Gimmi, T., Jenni, A., Kiczka, M., Mäder, U., Mazurek, M., Rufer, D. & Waber, H.N. (2021): TBO Trüllikon-1-1: Data Report Dossier VIII Rock Properties, Porewater Characterisation and Natural Tracer Profiles. Nagra Arbeitsbericht NAB 20-09 VIII.
Crisci, E., Laloui, L. & Giger, S. (2021): TBO Trüllikon-1-1: Dossier IX Rock-mechanical and Geomechanical Laboratory Testing. Nagra Arbeitsbericht NAB 20-09 IX.
Marnat, S. & Becker, J.K. (2021): TBO Trüllikon-1-1: Dossier X Petrophysical Log Analysis. Nagra Arbeitsbericht NAB 20-09 X.
pdf NAB 20-09 TBO Trüllikon-1-1: Data Report Summary Plot(19.11 MB)
pdf NAB 20-09 TBO Trüllikon-1-1: Data Report Dossier I – Drilling(27.45 MB)
pdf NAB 20-09 TBO Trüllikon-1-1: Data Report Dossier II – Core Photography(380.47 MB)
pdf NAB 20-09 TBO Trüllikon-1-1: Data Report Dossier III – Lithostratigraphy(51.22 MB)
pdf NAB 20-09 TBO Trüllikon-1-1: Data Report Dossier V – Structural Geology(106.51 MB)
pdf NAB 20-09 TBO Trüllikon-1-1: Data Report Dossier VII – Hydraulic Packer Testing(38.91 MB)
pdf NAB 20-09 TBO Trüllikon-1-1: Data Report Dossier X – Petrophysical Log Analysis(15.81 MB)
To provide input for site selection and the safety case for deep geological repositories for radioactive waste, Nagra has drilled a series of deep boreholes in Northern Switzerland. The aim of the drilling campaign is to characterise the deep underground of the three remaining siting regions.
Summary Plot:
In this report, the results from the Trüllikon-1-1 borehole are summarised in the form of a composite plot, including a short technical explanation of the information displayed.
Dossier I – Drilling
In this report, first results from the Trüllikon-1-1 borehole are presented, in particular from the drilling operations and including the drill site construction.
Dossier II – Core Photography
In this report, first results from the Trüllikon-1-1 borehole are presented, in particular the photo documentation of the cuttings and core samples as well as the resinated core slabs.
Dossier III – Lithostratigraphy
In this report, first results from the Trüllikon-1-1 borehole are presented, in particular a detailed description of all encountered lithologies and lithostratigraphic units.
Dossier IV – Microfacies, Bio- and Chemostratigraphic Analysis
In this report, first results from the Trüllikon-1-1 borehole are presented, in particular the data from detailed microfacies analyses as well as ammonite- and palynostratigraphy, complementing the lithostratigraphic report (Dossier III).
Dossier V – Structural Geology
In this report, first results from the Trüllikon-1-1 borehole are presented, in particular from the detailed core goniometry and the characterisation of the tectonic structures observed in the drill cores.
Dossier VI – Wireline Logging and Microhydraulic Fracturing
In this report, first results from the Trüllikon-1-1 borehole are presented, in particular from the wireline measurements (petrophysical logging and microhydraulic fracturing).
Dossier VII – Hydraulic Packer Testing
In this report, first results from the Trüllikon-1-1 borehole are presented, in particular from the hydrogeological investigations such as hydraulic packer testing.
Dossier VIII – Rock Properties, Porewater Characterisation and Natural Tracer Profiles
In this report, first results from the Trüllikon-1-1 borehole are presented, in particular the data from detailed laboratory analyses on core material for petrophysical and geochemical rock and porewater characterisation.
Dossier IX – Rock-mechanical and Geomechanical Laboratory Testing
In this report, first results from the Trüllikon-1-1 borehole are presented, in particular from geomechanical laboratory testing on core material, such as triaxial and oedometric testing.
Dossier X – Petrophysical Log Analysis
In this report, first results from the Trüllikon-1-1 borehole are presented, in particular from the stochastic petrophysical log analysis combining selected wireline and Multi-Sensor Core Logger as well as laboratory measurements.